Madrone Logo
Madrone

You don't need a chiller in the desert.

Cool your data center with 20°C water while using 30% less water and electricity than a chiller. Forget the wet bulb, cool to the dew point.

Backed byNVIDIA Inception ProgramY Combinator
Installation Modes

Next-Gen Desert Hyperscaling

  • Scale Vera Rubin in 45°C+ ambient without thermal throttling or performance loss.
  • Maximize FLOPS/watt by maintaining lower chip temperatures to minimize silicon leakage.
  • Eliminate mechanical chillers and the associated high energy overhead in arid regions.

Brownfield Capacity Expansion

  • Unlock compute density in legacy envelopes by replacing inefficient chiller loops.
  • Future-proof legacy facilities for the power demands of Blackwell and Rubin architectures.
  • Bypass new permitting by staying within existing water and power allocations.
Optimal Facility Locations
History of Heat

1.5 Million BCE

Discovery of Fire

Homo erectus

1712

Converting heat to mechanical work

Newcomen Steam Engine

1856

Cooling via mechanical compression

Harrison Refrigeration System

1939

First Jet Engine Flight

Heinkel aircraft company

1962

Heat Pipes in Electronics

Los Alamos National Laboratory

1981

Space Shuttle Thermal Protection

NASA

2012

EV Battery Thermal Management

Tesla Motors

2022

Inertial Confinement Fusion

Lawrence Livermore National Laboratory

2026

First GW Scale Data Center

Meta Prometheus

Made in California